a pan-European operating Train to Speed-up the Homologation of a low noise Brake System with LL Brake Blocks
EuropeTrain - a pan-European operating Train to Speed-up the Homologation of a low noise Brake System with LL Brake Blocks
Johannes Gräber, Torsten Hilker, Dr. Stefan Dörsch
DB Systemtechnik GmbH, Minden, Germany
Based on the main conclusions of the synthesis report [1] UIC started the EuropeTrain project which aimed to investigate the use of noise reducing LL brake blocks regarding LCC and running stability of freight wagons. Following a German initiative in the 9th meeting of the Directors General of the European Railways in Berlin on September, 5th 2009, 29 railways, the sector organisations CER, EIM and UIC and 8 industry partners supported this pan-European and unique project to speed up and improve LL brake block testing in operations. A special test train has been subjected to an intensive test and monitoring programme throughout Europe.
The train consisted of about 30 wagons, provided by several European railways to achieve a best selection of representative European wagons types and ran throughout Europe only for the in-service testing of LL brake blocks.
The path of the EuropeTrain was defined in different Loops, each representing certain operational, topographic and/or meteorological conditions. All operational conditions relevant for Europe had to be covered, e.g. running on different gradients with different operational modes, arctic winter areas and high temperature zones.
The duration of testing in service was planned to be at least one year taking into account all climatic seasons. In addition a mileage of minimum 200,000 km needed to be achieved, to collect enough data to allow at least to recommend longer inspection intervals than defined so far in the UIC “Usage guidelines for composite (LL) brake blocks” [2].
The train finally started in December 2010 with a first run on the Scandinavian Loop to Sweden and ended with a summer mixed Loop to the mountains of Austria combined with a one week run to Hungary.
After almost two years of service all over Europe, the operation of the train came to an end in September 2012 with a mileage of over 200,000 km within 16 runs, covering in reality all operational, topographic and climatic conditions relevant for Europe. This final project report [3] summarizes the most important results along the original main goals of the EuropeTrain, which were among others
EuropeTrain achieved a very good insight into the development of equivalent conicity under the given test conditions. The reduction of the nominal flange thickness, so the usage of a wheel profile with a flange thickness less or equal 30.5 mm (as it was already foreseen as a mandatory requirement in the Usage guideline [2]) is an important basis for the successful operation with LL-blocks. All following conclusion are drawn on this basis.
The following observations can be derived from this analysis:
Conclusions of the UIC 518 tests and the continuous datalogger measurements
The qualitative link between equivalent conicity and running stability reveals a decrease of stability if equivalent conicity increases. The quantitative link between EC and stability is not so well known, as stability is driven by plenty of other characteristics:
It can be determined that:
It is expected that the different kind of vehicles will have different levels of acceptable EC values to ensure safe running behaviour.
With the results of the first three UIC 518 running tests (including all different wagon types used in the EuropeTrain) it can be summarised that the running behaviour of all tested wagons based on the existing contact conditions comply with the safety limit values specified in UIC 518 up to the maximum test speed of 120 km/h which proves a save running up to an operating speed of vmax = 110 km/h (test speed – 10%). The results of the fourth UIC 518 stability test show that the running behaviour of the tested wagon types Eas and Remms based on the existing contact conditions comply with the safety limit values specified in UIC 518 up to a maximum operating speed of vmax = 120 km/h (test speed 132 km/h).
If the equivalent conicity is higher than 0.4 (real measured wheel profile linked with the theoretical rail UIC 60E1 with 1:40 inclination and a gauge of 1,435 mm) the measured acceleration levels are exceeding the accepted limit of the UIC leaflet 518 in some parts of the line. The combination of worn wheels and worn rails results in principle in higher real equivalent conicity levels - partly higher than 0.8 in some sections based on the track conditions.
It can be concluded that for the whole wagons that were on EuropeTrain, an equivalent conicity of 0.4 (real measured wheel profile linked with the theoretical rail UIC 60E1 with 1:40 inclination and a gauge of 1,435 mm) is dynamically safe for operating speed of 100 km/h. Safety is also proven for an operating speed of 120 km/h except for wagons with bogie type Y25 with non-suspended side bearers.
To fulfil the second main goal - to deliver field experience on the wear of block and wheel with LL blocks (LCC) in the short term and of high quality – brake block and wheel wear were monitored very closely in the project. A huge data base was achieved that can serve as a very good basis for further LCC analyses.
Summarising the results, the following can be stated:
| Wheel wear rate (ΔSh) [mm/100,000 km]and in % to CI |
| CI empty | CI loaded | C952-1 empty | C952-1 loaded | IB116* empty | IB116* loaded |
| 0.7 100 % | 0.9 100 % | 0.8 109% | 2.2 237 % | 0.8 109 % | 1.8 194 % |
Table: Averaged over-all wheel wear rates of EuropeTrain operation
Based on the results of EuropeTrain, which are summarized in [3], UIC elaborated new inspection limits and inspection intervals regarding the monitoring of the wheel profile. These new rules are written down in the actual version of the usage guideline for composite (LL) brake blocks [5], which can be downloaded from the UIC-website.
As general requirements, which can be adapted by a ECM with a corresponding risk assessment, it is stated, that in case of using LL-blocks
Furthermore the guideline is giving proposals how to ensure the fulfilment of these requirements or even under which conditions the monitoring can be skipped. For ex-ample the actual inspection intervals are now expanded to 100.000 km/50.000 km, see [5].
As a consequence of this work, UIC stated the homologation of the two LL-brake blocks of the types IB116* and C952-1 on May, 1st for standard freight wagon with 920 mm wheel diameter.
On June, 1st, the 1:1 exchangeability of these two blocks under certain boundary conditions was added, on the basis of the report B126.13 DT 440 [4].
The ERA took over these technical data in its Technical Document 02, also since 1st of june 2013, so that these informations are available now in the whole freight wagon sector.
With these important milestones, the basis is made for a larger scale retrofitting of most of the existing freight wagon fleet, which is considered to have a big impact on the noise reduction in railway freight traffic within the next 10 years.
References:

PDF · 605 KB
View Acoustic Pass-by Test of the Europe Train - First preliminary resultsEurope Train Configuration Test Setup Preliminary Results:
H. Heckelmueller - DB Systemtechnik GmbH - Munich, October 22nd, 2012